Biblioteca Digital da UEM: Sistema Nou-Rau
Página Principal  Português   English  Español   Aumentar Texto  Texto Normal  Diminuir Texto
  Principal | Apresentação | Objetivos | Instruções Autores | Estatísticas | Outras Bibliotecas Digitais
  Sistema Integrado de Bibliotecas - SIB / UEM
Entrar | acessos | versão 1.1  
Índice
Página principal
Documentos
Novidades
Usuários

Ações
Consultar
Procurar
Exibir estatísticas

Procurar por:
Procura avançada

Dúvidas e sugestões


Consultar: Programa de Pós-Graduação em Engenharia Química

Início > Dissertações e Teses > Engenharias > Engenharia Química > Programa de Pós-Graduação em Engenharia Química

Título [PT]: Ajuste da planta de processos da plataforma de pampo usando análise pinch
Título [EN]: Retrofitting of the pampo offshore plant by using pinch analysis.
Autor(es): José Valdir Brescansin
Palavras-chave [PT]:

Análise Pinch. Retrofit. Integração energética. Brasil.
Resumo:
Resumo: O presente trabalho mostra o ajuste da planta de processo da Plataforma de Pampo, da PETROBRÁS, situada na Bacia de Campos. Esta planta foi projetada com uma concepção que previa pouco integração energética. Com a previsão de novos poços de produção, o seu sistema de geração de utilidade quente está submensionado. Para o desenvolvimento dos trabalhos foi proposta uma metodologia para o ajuste de planta de processos em operação. Ela é mais conservativa do que a metodologia existente na literatura. Para a execução do trabalho os softwares PIT desenvolvido pela PETROBRÁS, e o SUPERTARGET da Linnhoff March Co., para o ajuste da planta e o HYSIM para a simulação do trocadores. Ao final do projeto verificou-se que com um investimento de US$ 1,35 milhões é possível obter uma economia de US$ 1,46 milhões/ano de gás natural, que seria queimado para a geração de utilidade quente. O tempo de retorno é equivalente a aproximadamente de 11 meses. Com a implantação do projeto sugerido a plataforma resolverá o problema da falta de calor para o processamento do óleo novo, operando com apenas um aquecedor, ficando outros dois de reserva.

Abstract: This work presents the retrofitting of the Pampo offshore process plant which is situated em Campos Bay and belongs to PETROBRAS. Only few energetic integration was considered in the original design of this platform. As a result of the discovery of new oil wells the plant hot utility generation system has became overloaded. Thus, a study for better utilisation of the available energy in the process streams of this plant is required. Initially, it was proposed a method to adjust the operating plant. This method, which is more conservative than those presented in the literature, hás lead to results closer to the practical reality PTT software, developed by PETROBRAS and the SUPERTARGET software from Linnhoff March Co., were used to adjust the plant while the HYSIM simulator was used to calculate the heat exchangers. Results demonstrate that an investment of the US$ 1,35 millions make it is possible to achieve an overall saving US$ 1,46 millions/years. This saving is related to the natural gas, which would be burned to produce of the hot utility. The returning time for this investment is around 11 months. The implementation of the suggestions proposed in this work should solve the energy shortage problem for processing the new oil just with one heat exchanger, remaining the two existent exchangers as spare ones.
Código: vtls000080549
Informações adicionais:
Idioma: Português
Data de Publicação: 1997
Local de Publicação: Maringá, PR
Orientador: Prof. Dr. Mauro Antonio da Silva Sá Ravagnani
Instituição: Universidade Estadual de Maringá. Departamento de Engenharia Química
Nível: Dissertação (mestrado)/
UEM: Programa de Pós-Graduação em Engenharia Química

Responsavel: beth
Categoria: Aplicação
Formato: Documento PDF
Arquivo: JoseVB.pdf
Tamanho: 491 Kb (502408 bytes)
Criado: 02-08-2013 15:51
Atualizado: 02-08-2013 16:24
Visitas: 1525
Downloads: 52

[Visualizar]  [Download]

Todo material disponível neste sistema é de propriedade e responsabilidade de seus autores.